We blogged about the building process of our house to document it for ourselves and to help others. Our house is finished and we have moved in and we love our home. Building a house isn't a process that goes perfectly, no matter what builder you pick, and this is our story. Every problem we had during the building process has been made right by Ryan homes. This isn't complaint blog, its how we felt at the time of our post during the building process.
Showing posts with label crooked pole. Show all posts
Showing posts with label crooked pole. Show all posts

Sunday, June 14, 2015

Week 4, Framed up to the Roof


Wow, in 3 days we went from foundation to framed up to the roof. We are really impressed at their speed. As our wood was delivered on Wednesday and they had the roof done by Friday. We finally put our sold sign on our lot, we have forgotten to bring it every week until this week.

Back of the house

Rear left

Rear right 
Side (front left)

We have noticed a couple of things we will bring up at our pre drywall meeting if not fixed by then...
The crooked pole in the basement (we checked all the poles with a level only one is off)
The small surface crack in the basement slab that has formed here the sump pump.
The shower seat size, it only 8 inches, we are hoping this will 10
One of the studs in the coat closet is broken off at the bottom
Missing window in the water closet (could just be not cut yet)
Everything else looked good so far.
Note there were no stairs to the upstairs yet, but we brought a 8 foot ladder (6 foot didn't reach we tried, lol)
Picture Time....Problem areas
Crooke pole
Level on crooked pole
Surface crack in the basement slab
Missing window in water closet 
Shower seat size

Now Regular inside Pictures

Morning room
Kitchen 

Family room

Family room another angle

Dinning room

Living room
Master bath tub

Master bedroom 
Huge walk in closet for spare bedroom, so much bigger then we thought it would be

Window framed in the basement (this is the fix for basement door being in the wrong spot) very happy with this fix

View from master bedroom :)

Basement door single patio door























Thursday, June 11, 2015

Mid-Week 4, Framing, 1st floor

Our wood was supposed to be delivered on Wednesday. So my husband went to check it out on his way home from work that day. They had already started framing. I didn't think they would get started so fast, I'm impressed with their speed this week. The main thing I wanted to check was the poles in the basement, as last week some of the holes for poles didn't line with the holes for the beams. And what do you know they put the poles up crooked so they could get them in holes under the beams. I would think they would fix the issue before continuing, I was wrong. Not sure how they will fix this, cut into the  basement floor for a bigger hole or... But they will be fixing it. I have to say other then the crook pole and the rebar sticking out of the basement floor, everything else looked okay at least from the pictures my husband took in the dark. My PM updated us today with a picture. He also said trades will be started mid next week, and we will need to schedule our pre-drywall meeting, how exciting. I didn't  say anything about the poles being crook as I wanted to see it in person and use a level, and give them time to fix it, before I say anything to him about it. And now pictures...I post more when we see it in the sunlight on the weekend.

This is the crooked pole, it doesn't look level to my eyes

This picture of the poles they look level, I think it's the angle of the picture

Back of the morning room, the morning room is huge, so glad we did this option.

Family room and stairs that aren't in yet. It's funny, the morning room feels better than the family room currently.

The front of the house, lookin good

This is the picture from our PM, easier to see in the sunlight :)

Our rear covered porch

Wow look at the size of our morning room :) they just framed the window as a door for now

This is the living room, not sure why there is what looks like a header above one window and not the other, most be a reason I'm guessing.

I'm little annoyed at NVR mortage today, they re-ran our credit without saying anything to us. I got a notice from credit monitoring service, I asked NVR why, they said our approval expired since it's taken so long to get started, I wish they would have told us they needed to do this before they did it. From my understanding they are required to get approval before running our credit, I didn't think they could run it again without approval or notification. With that being said rates are on the rise. They said we might be able to lock in within the next 7-14 days. The question is do we lock now or wait and hope the rates drop, as we can't re lock with our loan type. I also learned about a grant for my mortgage type that will cover our down payment, I heard it's hard to get approved for the grant, but it's worth a try. NVR has been really good to us so far other than re running our credit, so I'm going to forgive them for this. I hope they can find a way to lower the rate with a different loan type.