Our Change Orders along with our Red Flag. The one’s labeled X means this change order was change again to the change order labeled * .
X Double Patio Door in Basement $4595 (price stayed even when changed to single)
X Red Flag Relocation of Walkout Basement Door (from the back of under the morning room to the under the door in the morning room above) $750 (price stayed)
Light/Fan Rough In (Morning Room) $225
Light/Fan Rough In (Master Bedroom) $225
Light/Fan Rough In (Family Room) $225
*Single Patio Door in Basement (originally was double patio door but they said it wouldn't fit) (cost the same as the double patio door)
*Red Flag Relocation of Walkout Basement Door (from under the door in the morning room above to the back of the house on the left where the window was) (cost the same as the other location)
Red Flag Shower-pan changed to mud set tile in master Bathroom $395
Flooring $6587
Wiring $998
Extra Outlet in Basement $175
Totaling 14,175 in Change Orders
Flooring Breakdown (Cost upgrades)
$662- tile for mud set in master shower
$150 nicer shelf and soap dish
$150 Nicer Shelf and Soap Dish in master shower
$500 Basement Carpet Upgrade Level B
$450 Basement padding upgrade
$-225 Half Bath replacing A tile with laminate (money saved)
$500 Dining Carpet Upgrade Level E
$100 Dining Padding Upgrade
$695 Family Room Carpet Upgrade Level E
$125 Family Room Padding Upgrade
$200 Hardwood Floor in Foyer Upgrade Level B
$595 Living Room Carpet Upgrade Level E
$125 Living Room Padding Upgrade
$1420 Master Bathroom Tile Upgrade Level D
$695 2nd floor Carpet Upgrade Level B
$595 2nd floor Padding Upgrade
Wiring Breakdown
$799 Basement 5.1 Surround Sound Pre-wire
$199 Verizon FIOS Pre-wire
The double changes was because we found out after our first change that we were getting rear covered porch included so we couldn't make that change. Everything we picked out seemed fairly priced but basement door and mud set master shower title. The master shower med set tile we got charged twice for this change ($395 Ryan and $662 flooring people) there is no way that tile cost $66 per square feet plus labor, it’s 10 square feet) Also we should have to pay for a double patio door if we are only getting a single installed.
If I were to add anything else it would 2 more TV cables and 2 more fan/light rough in for the other bedrooms. But I won’t because I know these things can be done later and we already added so much.
When it comes to basement remodeling and finishing for your basement, we know that it takes creativity and knowledge to finish the project. basement remodels
ReplyDelete