1. In Basement the Front Left Speaker isn’t cut out, all the rest appear to be cut out with plates over
2. Cabinet doors and draws aren’t straight in the Kitchen
3. Siding isn’t down far enough down to cover framing braces, noticeable in the rear of the house
4. There are large gaps on where the siding and cement meet at the basement window, these gaps are too large to just be filled with caulk. (there were a lot of siding/caulking issues we saw all around the outside, didn’t list all)
5. Basement Door doesn’t shut well
6. Extra hole for switch of the fan in half bathroom upstairs, both the fan and light need to be on the same switch plate
7. In Kitchen the counter top lip was installed, but it shouldn’t, (please leave lip installed where it goes all the way up to the bar near sink, just remove the small 3in lip)
(picture below is the lip to leave installed)
8. The Master bathroom shower walls have a bunch of chipped wall tile installed
9. Missing soap dish in Master bathroom shower
10. Wrong tile was installed in Master bathroom shower floor (The flooring company showed us a tile that was a cream color (almond, pictured below) and told us it was the only tile we could have for the shower floor, as we aren’t allowed to miss match our tile and it was the one that went with the tile we selected for the wall and floor for that bathroom, yet a dark gray tile was installed)
11. The corner tile in master bathroom tub should be one tile not two tiles put together
12. The light in extra room of the unfinished area has no pull string or switch that turns it off/on
13. The outlet in the unfinished area of the basement near the cabling box has a wire running to the outlet that isn’t rated for the outlet installed
14. Wall bump out between the family room and hallway on the kitchen bar side isn’t square
15. The handrail in the stairwell has rough joints, nicks, and rough patches on it
16. There is water in the pan of the HVAC unit in the basement














































































