We blogged about the building process of our house to document it for ourselves and to help others. Our house is finished and we have moved in and we love our home. Building a house isn't a process that goes perfectly, no matter what builder you pick, and this is our story. Every problem we had during the building process has been made right by Ryan homes. This isn't complaint blog, its how we felt at the time of our post during the building process.

Our Floorplan

We selected elevation A.

We added the Morning Room (that extended the Kitchen) We are not doing any of the OPT. Windows, we hate windows on the side, who wants to look at the side of their neighbors house

 We picked the 3 bedroom layout and upgraded the master bath to the highest option.
We getting the finished Basement free (it's included) and we did the rough in for the bathroom for later. Note there will be no framing done for the bathroom and no door bathroom or the right side of the unfinished part because it will be left all open to the unfinished storage on the left. We added a door to where the window is on the back left. It's only a single patio door as for the covered rear porch from the first floor gets in the way of having a double door. We picked this spot because we wanted the door to be under our future deck (that way it would be covered).

No comments:

Post a Comment